Hydrologic Modelling of Connectivity Expert Panel Recommendations 2025–Scenario 3–Extended Resumption of Flow

Source
Australia Data Catalogue
Published
2026
Country
Australia
Format
multiple formats
Access
Open access
License
Creative Commons Attribution 3.0 Australia
Themes
Water & Sanitation, Fresh Water, Machine Learning & AI

Get the data from Australia Data Catalogue

About this dataset

Flow rates for imposing restrictions have been set at below baseflow for 90 consecutive days at trigger sites, flow rates for lifting restrictions have been set at the lower small fresh threshold for restriction trigger sites; flow rates must exceed the small fresh threshold for 14 days at restriction trigger sites for lifting restrictions. Supplementary and floodplain harvesting has been restricted in the regulated NSW Border Rivers, Namoi, Gwydir and Macquarie River systems when the closest downstream section in the Barwon –Darling is restricted. The 30 GL cumulative flow trigger at Bourke for lifting restrictions has been removed. Three additional trigger locations included as recommended by Panel: Mungindi, Collarenebri and Louth. Note: See Analysis of the Connectivity Expert Panel Recommendations: Hydrologic modelling assessment.pdf (attached) for more details. Note: If you...

How the data was collected

The source metadata does not specify a detailed collection methodology. Provenance: this record was harvested from Australia Data Catalogue and published by NSW Department of Climate Change, Energy, the Environment and Water. Consult the original source for methodological details, temporal coverage, and access constraints.

Browse sustainability datasets on SusanHub